A curated library of DSR rate schedules, MERC/MSEDCL circulars, technical references and estimation tools — used daily by our engineers and shared here for our partners, consultants and contractors.
Pune Municipal Corporation Non-DSR rate schedule for electrical works — labour, supply, erection and BOQ rates.
Maharashtra State Electrical Department Schedule of Rates for FY 2023–24. Material, labour and composite item rates.
Public Works Department District Schedule of Rates for FY 2018–19. Useful for legacy estimation and reference.
Comprehensive cost data workbook (dated 14 Oct 2024) — material, equipment and composite rates ready for BOQ generation.
MERC tariff order issued 28 April 2023. Reference for commercial tariff revisions affecting consumer categories across Maharashtra.
Discom circular on earthing requirements for metering cubicles. Mandatory reference for HT/LT consumer installations.
Government circular on supervision and centage percentages for departmental works during FY 2022–23.
Circular No. 3905 dated 13 Feb 2023 — guidelines on loading centages for District Development Fund and DPDC scheme works.
Notification waiving 1.3% supervision charges on electrical works executed within MIDC areas — important for MIDC project costing.
MSEDCL approved load calculation methodology and worksheets for HT/LT consumers and industrial connections.
Standard A1 form for electrical installation test reports — required for statutory submission and approval.
Ampacity reference tables for HT and LT cables — copper and aluminium conductors, various insulation grades.
Standardised BOQ format used for electrical project tendering — itemised, structured for govt and corporate submissions.
Calculation worksheet for security deposit estimation against new electricity connections / sanctioned loads.